Well, we received the Architectural permission – now I need to apply to GASK with a fee (see previous post) + drawings + site plan + agreements with: Architect; Contractor and Technadzur. The latter is an individual (not a company) who is licensed to supervise my construction. Once I have applied none of this is ever checked again. Nobody will visit the site. I can effectively do whatever I want.. build it unsafely – paint it orange… add no thermal insulation.
In the meantime we also now have permission for Water and Sewerage (cost sub $500) which designates my connection points and insists I re-build a new inspection chamber for the State at my cost. Ho hum.
Soon – Electricity.
Below is the work on the Ground floor slab in progress.